News Flash

News Headlines

Posted on: April 20, 2021

Lake Drive Survey Work

land-survey-civil-engineer-working_3446-431 pic

Lake Drive Survey Work.  The Village of Fox Point has entered into an agreement with the Department of Transportation for the resurfacing of Lake Drive in the Village of Fox Point.  Kapur & Associates has been hired by the DOT and the Village to prepare the design for the project and, beginning in early May, they will begin to survey road, utilities, ditches and property lines along the entire approximate 2.6 miles stretch.  Many residents will begin to see flags pop up in their yard to mark out the utilities within the right of way; please leave those in place so that it is easier for our consultant to capture the necessary survey data.  The survey work will continue into summer and, thereafter, they will begin the design process for the road which is expected to be resurfaced in either 2025 or 2026.  The attached letter provides more details regarding the upcoming survey work.


/DocumentCenter/View/4749

Facebook Twitter Email

Other News in News Headlines

fyi1

Open Book - May 10, 2021

Posted on: February 8, 2021
construction-zone-stock-aluminum-sign-18x24-150x150

Road and Utility 2021 Project

Posted on: May 11, 2021
Village Logo 1

2020 Annual Stormwater Report

Posted on: April 19, 2021
Pipe_Check_Logo_580x580-min

MMSD Pipe Check Program

Posted on: April 19, 2021
unnamed

COVID-19 Vaccination Plan

Posted on: January 21, 2021