A PIM was held on Tuesday, November 7, 2023, at Fox Point Village Hall.  Village staff and representatives from the project consultant, Baxter & Woodman, were present.  The meeting was to review the final project plans and communicate the tentative schedule for the project to be completed in 2024.  Below is the information that was available at the meeting.

Power Point Presentation

Plans - Port Washington Rd to Lake Dr

Road Cross section

Project Area and Overview:

  • Bradley Road between Port Washington Road and Lake Drive
  • This project has been rescheduled to 2024.

The work to be performed on Bradley Rd includes replacement of the water mains, improvements to the storm water management system, and repaving the roads.  Bradley Road may also include either a pedestrian path/sidewalk or paved shoulder in order to improve access to pedestrians and bicyclists.  

Public Information Meeting (PIM)

A PIM was held on Thursday, February 17, 2022 at Fox Point Village Hall to discuss each of the six (6) proposed road sections for Bradley Road.  Five of the six proposed sections incorporate a widened road, a path or a sidewalk in order to increase pedestrian and bicycle safety while the sixth option maintains the status quo (two lanes of traffic with a narrow paved shoulder). 


Please continue to visit this page for updates on the project including a second PIM that will be held to discuss the project schedule once it has been awarded by the Village Board.  Questions regarding the project can be directed to Scott Brandmeier, Director of Public Works, at 414-351-8900 or sbrandmeier@villageoffoxpoint.com.